logo

products details

Created with Pixso. Home Created with Pixso. Products Created with Pixso.
Mineral Wool Board Production Line
Created with Pixso.

Fully Automatic Rock Wool Production Line for 10000-50000tons/year with 50-200mm Thickness Mineral Wool Board Making

Fully Automatic Rock Wool Production Line for 10000-50000tons/year with 50-200mm Thickness Mineral Wool Board Making

Brand Name: Greenson
MOQ: 1
Price: US $2000000-4000000
Payment Terms: L/C,T/T
Detail Information
Place of Origin:
HEBEI
Product Name:
Machines For Building Materials Fully Automatic Rock Wool Sheet Rock Block Making Machine
Keyword:
Stone Wool Production Line Rock Wool Board Production Line
Production Capacity:
10000-50000tons/year
Thickness:
50-200mm
Density:
100-200kg/m3
Main Process:
Mixing, Forming, Water Cutting, Drying
Length:
1200-2400mm
Width:
600-1200mm
Highlight:

Fully Automatic Rock Wool Production Line

,

10000-50000tons/year Mineral Wool Board Production Line

,

50-200mm Thickness Rock Wool Board Making Machine

Product Description
Fully Automatic Rock Wool Sheet & Block Making Machine
The SUNTHERM Rock Wool Production Line transforms raw materials including basalt, dolomite, and binders into high-quality rock wool products. The automated process begins with material loading via elevator into the hopper, followed by melting in the furnace to create lava flow. This molten material is then cooled and spun into fibers by the centrifuge, with binders added during the spraying process. Fibers are drawn down to the mesh belt by negative pressure wind to form the original felt, which is then transported through pendulum cloth machines and curing furnaces. The final products are precisely cut both longitudinally and transversely before packaging and storage.
Product Specifications
Application Manufacture of Rock Wool Blanket and Rock Wool Board
Annual Capacity 10,000 to 80,000 tons/year (increments of 10,000 tons)
Raw Materials Basalt, dolomite, binders, and related materials
Energy Supply Systems
• Raw coal energy supply system
• Power energy supply system
• Natural gas energy supply system
Frequently Asked Questions
What payment terms do you prefer?
T/T, L/C, West Union, Cash, and other standard payment methods.
How long is the validity of quotation?
Quotations are generally valid for one month from the date of issue. Prices may be adjusted based on raw material cost fluctuations and market changes.
Do you provide OEM/ODM Service?
Yes, we offer custom manufacturing services to meet diverse global client requirements and budgets. Please provide necessary specifications for customized solutions.
Do you offer a guarantee?
Yes, we provide a comprehensive one-year product guarantee along with after-sales service support and technical assistance.
What is your Minimum Order Quantity (MOQ)?
1 Set
Fully Automatic Rock Wool Production Line for 10000-50000tons/year with 50-200mm Thickness Mineral Wool Board Making 0